Södra to invest in new CLT facility at Värö sawmill in Sweden

市場: 面板
31 八月, 20:08
Södra is investing in a small facility for cross-laminated timber (CLT) adjacent to Södra’s sawmill at Värö in Sweden. The plans include a future investment in a larger facility, as the company says in the press release received by Lesprom Network.

“Södra is focused on increasing the use of sustainable timber construction and wants to take part, and to stake out a position, in this growing market. Production is scheduled to commence in early 2019. The facility will have an annual capacity of about 5,000 cubic metres per shift,” said Jörgen Lindquist, President of the Södra Wood business area.

An extensive project has been ongoing for 12 months to improve and develop the profitability of Södra’s existing sawmills. At the same time, the best type of timber engineering for Södra’s structure, position and various markets has been under assessment.

The location at Värö has been strategically chosen for its proximity to several Nordic high-growth regions, and the ease of shipping to both the UK and other international destinations. The facility will be co-located with Södra’s pulp mills and sawmills for access to green electricity and completed infrastructure. The investment is expected to require several new recruitments.




標籤: Sodra Timber

評論

喜歡這一點,你需要註冊。
要做到這一點,請輸入您的姓名和電子郵件地址。
名稱:
姓:
電子郵件:
性別:
如果您已經註冊,
請輸入您的詳細信息 這裡
要留下意見,你需要註冊。
要做到這一點,請輸入您的姓名和電子郵件地址。
名稱:
姓:
電子郵件:
性別:
如果您已經註冊,
請輸入您的詳細信息 這裡
我們歡迎通過相關的意見和數據推動故事的評論。如果你看到一個評論,您認為是無關緊要的或不適當的,可以將其標記為我們的編輯使用報告濫用鏈接。在表達意見的看法,並不代表Lesprom網絡。有關我們註釋策略的更多信息,請參見: http://www.lesprom.com/legal/comment_policy/
返回頁首