Toscotec will supply a new Modulo-Plus tissue line to Celupaper S.A. Toscotec’s Modulo-Plus will be delivered with a design for the production of high quality tissue products featuring a gross daily production of 65 tonn.

棉纸

Toscotec to supply a new Modulo-Plus tissue line to Celupaper S.A. in Buenos Aires, Argentina

Apr 14, 2016. /Lesprom Network/. Toscotec will supply a new Modulo-Plus tissue line to Celupaper S.A., part of Grupo Vual, South American leading regional player for the production of high quality tissue products, as the company said in the press release received by Lesprom Network.

The new line will be installed at Papelera Nicaragua. This is the third order in 2 years: previously Toscotec has been chosen to reconfigure the existing Fourdrinier machine PM2 with the installation of the TT DOES package (Drying Optmization for Energy Saving) already started up in 2015 and to supply a new PM3 Modulo line that will start up in May, this year.

Toscotec’s Modulo-Plus will be delivered with a design for the production of high quality tissue products featuring a gross daily production of 65 tonn. The tissue machine is equipped with single layer headbox, one press configuration, TT SYD-3200MM, TT Milltech-MYH Monosystem Hood fed by natural gas and steam and condensate removal system. Approach flow system, electrification & control, as well as erection supervision, start up assistance and training programs are also included in the scope of supply.

The PM4 will be started up within the end of 2017.

Toscotec is a turnkey supplier to the global tissue industry.