When fully operational, the mill will have 4–5 employees working in two shifts, which will enable the production of 40 m3 of wet veneer from 80 m3 of veneer logs in an eight-hour shift.
When fully operational, the mill will have 4–5 employees working in two shifts, which will enable the production of 40 m3 of wet veneer from 80 m3 of veneer logs in an eight-hour shift.