Andritz’s Pulping and Fiber Division is to supply a new BCTMP line and stock preparation line for KAMA Karton LLC, Krasnokamsk, Russia. Start-up of the complete KAMA production line is scheduled for the 1Q 2019.

Wood Pulp

Andritz to supply a new BCTMP line and stock preparation line for KAMA Karton in Krasnokamsk, Russia

 Andritz’s Pulping and Fiber Division is to supply a new BCTMP line and stock preparation line for KAMA Karton LLC, Krasnokamsk, Russia. Start-up of the complete KAMA production line is scheduled for the 1Q 2019, as the company says in the press release received by Lesprom Network.

The new BCTMP line uses birch as raw material and has a design capacity of 395 admt/d. The high-efficiency mechanical pulping system begins with a chip washing system, a pre-steaming unit, and an impregnation system equipped with an MSD Impressafiner.

It is followed by the first refining stage, comprising an Andritz high-consistency S2070 refiner with a 15-MW drive, while the second stage will use a newly developed Andritz low-consistency TwinFlo “Strong” refiner.

In addition, the reject refining system will contain an Andritz low-consistency TwinFlo refiner to ensure lowest energy consumption in combination with excellent pulp properties in both mainline and reject low-consistency refining.

State-of-the-art, low-energy Andritz FibreSolve FSV pulping as well as the latest developments in low-consistency refining will be included in the Andritz stock preparation system. In addition, the approach flow system is designed for three layers, each fitted with the compact Andritz ShortFlow Blending System, low-consistency cleaning, and modern headbox screening. The broke system will also be part of the delivery together with the fiber recovery systems.