The preliminary target capacity of the facility is 20 thousand tonnes of fibre per year, and it is likely to be located near an existing Suzano pulp mill.
Suzano
The tissue making line, converting equipment and the biomass boiler will be installed at the Aracruz mill in Espírito Santo, Brazil. The start-up is scheduled for the Q1 2026.