
The new system will connect flue gas condensation with Helsinki’s district heating and cooling networks.

The new system will connect flue gas condensation with Helsinki’s district heating and cooling networks.

Line scheduled for 2028 startup with capacity exceeding 100 million products annually.

Tubular superheater installation scheduled for September 2027 to improve boiler reliability.

Warp measurement and moisture controls scheduled for January 2027 commissioning to improve board quality.

Process Performance Solutions reaches Euro 1.7 billion net sales as Board assesses value creation.

Former Finnair and Outokumpu CFO joins Executive Leadership Team by January 2027.

Pulp, Energy and Circularity business area leader leaves after nine-year tenure in executive roles.

The new debarking and chipping line will process softwood and hardwood logs to increase chipping capacity and produce consistent wood chip quality for pulp and paperboard operations.

The machine will include forming-section dewatering, compact dryer geometry and two winders plus automation and lifecycle support, with start-up scheduled for fall 2027.

Turn-key installation scheduled for March 2027 to support boiler reliability and production uptime.

System produces lightweight three-dimensional trays and plates using cellulose fibers.

The project will replace the site's last third-party control system with a web-based distributed control system, include a DNAe historian and HIMA-based safety systems, and the customer will take over delivery in the first quarter of 2027.

Work at the dissolving wood pulp mill will replace pressure parts in the MgO1 recovery boiler that uses magnesium closed-loop recovery technology.

Stationary unit targets 2027 startup to lower energy use and enable kiln capacity increase.

Changes include closing the Sundsvall manufacturing site, adjusting operations in Gothenburg and Jelenia Góra, and temporary layoffs in Finland from June through December.

Crystallization system targets extended recovery boiler maintenance intervals beyond 24 months.

Possible temporary layoffs would run from June through December and cover parts of Packaging and Paper, and Pulp, Energy and Circularity.

System targets moisture management to improve board consistency and reduce waste.

New facility provides local assembly, spare parts, and training for Australia's pulp, mining, and renewable energy sectors.

Finance chief remains until end of September to ensure transition as successor search launches.