PMP received an order for two new hydraulic headboxes
Apr 13, 2010. PMPoland S.A. – member of PMP Group signed a contract with one of the North American paper maker for two new hydraulic headboxes and auxiliary systems. The target of the rebuild is a maintenance replacement.
Apr 13, 2010. /Lesprom Network/. PMPoland S.A. – member of PMP Group signed a contract with one of the North American paper maker for two new hydraulic headboxes and auxiliary systems. The target of the rebuild is a maintenance replacement, company said in a statement received by Lesprom Network.
PMP scope of supply covers two Intelli-Jet headboxes with fun pumps, attenuators (pulsation dumper), and thermal stabilization system. One of supplied headboxes will be equipped with dilution system (consistency profiling) and the second one will be ready for future CP installation. New headboxes and Integrated Dilution System will assure better quality of final product.
The 2-channel hydraulic headboxes will be installed on existing paper machine in one of Russian paper mills. The headboxes have 5000 width.
PMP will be also responsible for the assembly on the customer site. Assembly of the equipment and the machine start-up is scheduled on June 2010.